Plenty of hangers and finishers think in boards, not square feet. A per-board rate is
quick to quote and easy to check on the job. It only works if the rate covers
everything a board costs you, and if you know when to stop using it.
They are the same price written two ways, as long as everyone agrees on the board size.
Divide a per-board rate by the board's square feet and you have a square-foot rate. A rate
that sounds fair on a 4x8 is a lot less money per square foot on a 4x12, because the
bigger board covers half as much again.
Per board suits the people doing the work: you count boards as they go up, crews often
get paid that way, and the number is easy to sanity-check at the end of the day. Per
square foot suits customers and general contractors comparing bids. Work it out per board,
then show the square-foot figure too, and you can answer either question.
What the rate has to cover
Labor: what you or your crew are paid for that board, including payroll costs and insurance if you carry them.
Overhead: the truck, fuel, tools, phone, licensing, and the unpaid time spent measuring and bidding.
Profit: what the business keeps after the work is paid for. It is not the same thing as your wage.
If a per-board number only covers the hours, the job can look busy and still lose money.
The cost estimator guide walks through loading labor
with overhead and profit.
What should change the rate
Ceilings: slower and harder than walls. Many contractors add a per-board amount for ceiling boards.
Height and stairwells: scaffolding, lifts, and awkward reaches. Price them as a separate line, not buried in the average.
Cut-up rooms: closets, soffits, and lots of openings mean more cuts, more waste, and more corners per board.
Finish level: a Level 5 finish takes more coats and sanding than Level 4. See Level 4 vs Level 5.
Texture, corner bead, and patching: separate lines so the customer can see them.
Access and site conditions: occupied homes, carrying board upstairs, protection, cleanup, and haul-off.
When per-board pricing breaks down
On a patch or a three-board job, the drive, setup, and drying time cost about the same as
on a full room. A per-board price there either loses money or looks silly. Set a minimum
charge or a day rate for small work, and use the calculator's minimum field to see where
it kicks in. The patch calculator covers the material side.
Free per-board calculator
Turn your per-board rates into a labor total.
The numbers filled in below are an example so the calculator shows something. They are
not market rates. Replace them with your own.
Labor total
$0.00
0 boards · 0 sq ft
The minimum charge applies: the per-board total is below it.
Hanging$0.00
Tape and finish$0.00
Ceiling add-on$0.00
Extras$0.00
Average per board$0.00
Same price per square foot$0.00 / sq ft
Price the whole job from the truck.
BoardCount counts the boards and materials from room measurements, adds your labor and markup, and sends the customer a proposal PDF.
Labor only. Materials, tax, and markup are not included. Results depend on the numbers
you enter. Check them against your own costs before you send a price.
Count the boards first
Measure the rooms, get the boards.
Walls, ceilings, openings, sheet size, and waste in one pass, or download the takeoff worksheet.
How do you convert a per-board drywall price to price per square foot?
Divide the price per board by the board's area. A 4x8 board is 32 square feet, a 4x10 is 40, a 4x12 is 48, and a 54-inch by 12-foot board is 54. A per-board rate is only comparable to a square-foot rate when you know which board size it assumes.
Should hanging and finishing be priced separately per board?
Pricing them separately makes the bid easier to check and to split when a different crew hangs or finishes. Many jobs are quoted as one hang-and-finish number, but working them out separately first shows where the money goes.
When does per-board pricing not work?
Small repairs, patches, and jobs with very few boards. Setup, travel, and drying time cost about the same whether you hang two boards or ten, so those jobs need a minimum charge or a day rate.
Does a per-board rate include materials?
Not in this calculator. It prices labor only. Price board, compound, tape, screws, and bead separately from current supplier prices, or let BoardCount count and price them from room measurements.